Friday, February 25, 2011

A Productive Week

Estridge really came through this week and did a great job making up for the framing error. We ended up not losing much time at all, and things are pretty well back to normal at this point. We even have windows!


That picture is from Monday, Day 64. Everything had been pretty well re-assembled by then, but the house still felt like a mess and we had a hard time being excited about the windows when everything seemed so haphazard.

Things started looking up by Tuesday, especially on the exterior. Look! No snow!


The color of the second story siding (it's not really siding - I'm not sure what it's called, actually) will be similar to how it looks in that photo, but it's still unfinished at this point. That will all be painted sometime later. Everything that's pink will eventually be brick. Though the pink is kind of growing on me. I think I'll miss it when it's covered up!

On Wednesday, Day 66, the front awning was put back in place and more windows were installed. We even have a front door now!


No back door just yet, though I don't know why. I'm sure there's a reason.


See that big square window on the top level? There's a window seat there that I'm already loving. I think that may become one of my favorite spots in the house.

No comments:

Post a Comment